Campus Building Information

Campus Building Information

Lane Community College Building Square Footage Report

Listed by Building ID#

#BUILDING NAMEFLOOR

GROSS SQ. FT.

PER FLOOR

GROSS TOTAL
Main Campus Sub Total1,173,621.42*
000Center

Basement

1st Floor

2nd Floor

3rd Floor

4th Floor

27,140.10

40,923.75

37,845.87

34,732.97

43,968.03

184,610.72
001Student Services

1st Floor

2nd Floor

21,275.01

21,423.92

42,698.93
002Business1st Floor

2nd Floor

9,733.93

9,624.12

19,358.05
003Administration1st Floor

2nd Floor

8,150.49

8,156.25

16,306.74
004Health Technology1st Floor

2nd Floor

21,883.42

21,942

43,825.42
005Physical Education1st Floor

2nd Floor

51,705.02

53,779.87

105,484.89
006Performing Arts

Basement

1st Floor

2nd Floor

5,111.91

34,307.30

20,909.40

60,328.61
007Campus Services1st Floor

2nd Floor

20,503.27

21,518.80

42,022.07
008Welding1st Floor21,236.2521,236.25
009Auto/Diesel Technology1st Floor

2nd Floor

32,755.73

5,865

38,620.73
010Air Technology1st Floor

2nd Floor

41,015.39

41,460.71

82,476.10
011Art/GED1st Floor

2nd Floor

19,297.39

19,586.84

38,884.23
012Machine Technology1st Floor

2nd Floor

46,004.39

33,081.42

79,085.81
013Electronic Annex1st Floor7,179.327,179.32
015Electronics1st Floor

2nd Floor

8,655

8,421.83

17,076.83
016Science1st Floor

2nd Floor

62,633.44

26,913.89

89,547.33
017Forum1st Floor

2nd Floor

3rd Floor

9,671.53

9,734.89

89,312.27

108,718.69
018Industrial Technology1st Floor

2nd Floor

9,831.22

9,824.80

19,656.02
019Workforce Training1st Floor

2nd Floor

38,013.19

51,267.73

89,280.92
024Child Care Center #11st Floor3,090.753,090.75
025Child Care Center #21st Floor3,430.943,430.94
026Child Care Center #31st Floor6,489.596,489.59
027Child Care Center #41st Floor4,414.924,414.92
030Health & Wellness Center1st Floor

2nd Floor

21,533.41

21,721.37

21,533.41

21,721.37

031Native American Longhouse1st Floor6,542.786,542.78

*205.104 Building Gross Area

Definition. The sum of all areas on all floors of a building included within the outside faces of its exterior walls, including all vertical penetration areas, for circulation and shaft areas that connect one floor to another.

Description. In addition to all the internal floored spaces obviously covered above, Gross Area should include the following: excavated basement areas used for storage or other purposes; interstitial space (i.e., mechanical floor or walkways), mezzanines, penthouses, and attics used for storage, mechanical or other uses; garages; covered porches (do not include exterior pedestrian canopies or exterior metal extension fire stairs), whether walled or not; inner or outer balconies, whether walled or not, if they are utilized for operational functions; and corridors or walkways, whether walled or not, provided they are covered and utilized for operational functions. The footprints of stairways, elevator shafts, and vertical duct shafts are to be counted as gross area on each floor they pass through. Transformer vaults, ventilation rooms, chemical storage spaces etc., attached to a building or located on the roof should be reported as space within the building.

GSF = Net Usable Area + Net Unusable

Limitations. Include only basement, under-floor and attic areas that are floored. Exclude all areas having a clear standing head room of less than a 6 feet 6 inches, unless allocated by the Campus Space Committee for an operational use. Exclude open areas such as unoccupied roofs, surface parking lots, playing fields, exterior pools, and exterior courts. Exclude unexcavated basement areas.

Exception. Include the top, unroofed floor of parking structures where parking is available.

Source: Oregon University System

Other Main Campus Facilities

BLDG #BLDG NAME1996 SQ FT2002 SQ FTNEW SQ FT BY 2012TOTAL SQ FTYR ACQ
Other Main Campus Sub-Total9,7096,6045,39021,703
023FMP Nursery01,500nc1,5002002
029Waste Water Treatment Plant0660TBD6602000
032FMP Storage02,240nc2,2402000
033Test Cells3,100ncnc3,1001968
034Cooling Tower1,752ncnc1,7521968
035PA Storage2,890ncnc2,8901977
036PE Storage1,430ncnc1,4301977
037Greenhouse240ncnc2401968
038Chemical Storage Facility297ncnc2971993
n/a3 Stop Exterior Elevator0100nc1002002
n/a3 Stop Exterior Elevator0160nc1602002
n/aBus Station01,944nc1,9442002
n/aSolar Station005,3905,3902010

Branch Campuses

BLDG #BLDG NAME1996 SQ FT2002 SQ FTNEW SQ FT BY 2012TOTAL SQ FTYR ACQ
Branch Campus Sub-Total125,10645,173200,244360,724
Grand Total873,959259,954298,7341,556,048.42
040Wildish Building12,80015012,95095 / 00
041Downtown Center56,508ncnc56,5081977
043Flight Tech Operations3,680ncnc3,6801940
044Flight Tech Center5,049ncnc5,0491989
045Flight Tech Hanger3,900ncnc3,9001989
046Aviation Maintenance Training Facility23,400nc1,57424,97495 / 09
047AMTF Shop Building003,7003,700200?
048Cottage Grove Center (old)7,900ncnc7,9001984
049Cottage Grove Center (new)018,613nc18,6131996
050Florence Center9,2996,5281,59917,42676 / 00
051Siltcoos Station2,570nc2,5701974
053Thurston CLC*03,503nc3,5031999
054Oakridge CLC*02,720nc2,7201999
055Willamette CLC*02,527nc2,5271999
056Churchill CLC*02,523nc2,5231999
057McKenzie CLC*02,893nc2,8932000
058Elmira CLC*02,896nc2,8962000
060Junction City CLC*02,820nc2,8202000
TBDKLCC008,2008,2002006
061IDowntown Campus Building (Instructional)0095,32195,3212012
061RDowntown Campus Building (Residential)0089,85089,8502012

nc = no change

TBD = to be determined

*CLCs no longer occupied, operated, serviced, or maintained by Lane Community College.